Mining

Mining camps

Pesina Steel designs and supplies prefabricated mining camps (dormitories, mess halls, ablution blocks, clinics and offices for mine sites), shipped from Istanbul as bolted kits and assembled on a slab prepared locally.

Prefabricated mining camp buildings on a mountain site

What a mining camp needs

A mining camp starts small as an exploration camp, grows during construction and settles into a permanent camp once the mine operates. The buildings are modular for that reason. A new dormitory wing or a second mess hall can be ordered later and joined to the same grid.

  • Dormitories, 2 to 8 people per room
  • Toilet, shower and laundry blocks
  • Mess hall with kitchen, stores and cold room
  • Clinic, offices and recreation room
  • Guard post at the gate

Panel buildings or containers

Panel buildings give more square metres for the money and suit a camp that will stand for the life of the mine. Containers suit exploration camps that move between licences. Bare flat-packed 20 ft units stack ten to a 40 ft high-cube container. Roofing, sanitary ware and furniture take part of that space, so the final container count is worked out for each order.

Rock wool walls where fire rules apply

Kitchens, generator rooms and, on many mines, the whole camp must be built from non-combustible materials. Our rock wool sandwich panels are classified A2-s1,d0 under EN 13501-1, the class that specifications usually accept when they ask for non-combustible walls.

Type design for a 60-bed mining camp

We designed this camp in 2020 for a mining enquiry in Tanzania and keep it as a type design. It was not built, but the layout is a realistic starting point for a small exploration or early construction camp, and it grows by adding dormitory wings. The foundations were to be poured locally by the client.

BuildingSizeContent
Dormitory367 m², three wings of 18.9 × 6.5 m15 rooms of 3.77 × 5.22 m, 4 beds per room in bunks, two double lockers per room, 1.25 m covered walkway along each wing
Toilet block25 m², 6.4 × 4.0 m5 WCs, 3 urinals, 4 washbasins
Shower block25 m², 6.4 × 4.0 m5 showers, 4 washbasins
Mess hall181 m², 20.2 × 9.0 m70-seat hall, 30-seat staff room, kitchen, 2 stores
Totalabout 600 m²60 beds, 100 dining seats

Walls: 10 cm sandwich panel outside, 6 cm inside, EPS core (rock wool on request). Wall height 2.50 m. Trapezoidal galvanised steel roof at 11°. PVC windows with fly screens. The mess hall seats more people than the dormitory sleeps, so day workers living off site can eat in the camp.

Dormitory plan

Floor plan and front view of a three-wing camp dormitory with 15 rooms
Three wings of five rooms around a courtyard, with a covered walkway in front of the doors. Dimensions in cm. Drawn: H.Y. Checked: H.A.

Toilet and shower blocks

Floor plans and front views of a camp toilet block and shower block
Toilet block (left) and shower block (right), each 6.4 × 4.0 m with a vent above every cubicle. Dimensions in cm. Drawn: H.Y. Checked: H.A.

Mess hall plan

Floor plan and front view of a camp mess hall with kitchen and two dining rooms
Workers' hall for 70, kitchen with two stores in the middle, staff room for 30. Serving hatches open from the kitchen into both halls. Dimensions in cm. Drawn: H.Y. Checked: H.A.

How the design compares with IFC/EBRD guidance

Mines financed by international lenders usually have to follow the IFC/EBRD guidance on workers' accommodation. This is how the type design measures against its benchmarks.

BenchmarkIFC/EBRD guidanceType design
Floor space per person4 to 5.5 m²about 4.9 m² (19.6 m² room, 4 beds)
People per room2 to 84
Ceiling heightat least 2.10 mabout 2.50 m (wall panel height)
Toilets1 per 15 to 1 per 6 people1 per 12 (5 for 60)
Urinals1 per 15 people1 per 20 (3 for 60); a fourth urinal brings it to 1 per 15
Showers1 per 15 to 1 per 6 people1 per 12 (5 for 60)
Bunk bedsdiscouraged; keep to a minimumused to keep the footprint small; with single beds the same 60 people need twice the dormitory area
Mosquito screenswhere conditions requireon every window

Source: IFC and EBRD, Workers' accommodation: processes and standards, 2009.

What to send for a quotation

  • Headcount by role and the shift pattern
  • How long the camp must stand
  • Site location and the nearest port
  • The accommodation standard you work to (company, lender or national)
  • Who prepares the foundations

FAQ

Frequently asked questions

Who builds the foundations?
Usually a local contractor pours a slab or strip footings to our foundation drawing. The buildings arrive as kits that bolt onto it.
Can the camp grow with the mine?
Yes. The grid is modular, so another dormitory wing, a second ablution block or a larger mess hall can be added and connected to the existing rows.
Do you supply beds and lockers?
Bunk beds, single beds, lockers, tables and chairs can be included in the package, which is often cheaper than buying them near a remote site.
Can you design to our own camp standard?
Yes. Send the standard or the specification and the offer lists, item by item, what is met and where we propose an alternative.
Do you send an assembly crew?
Yes. Depending on the project we send our own assembly crew, or a supervisor who leads a local crew. All connections are bolted, and the offer states which option is included.

Get a quotation

Tell us about your project

Send the model, the quantity and the destination port or city. We reply with a price, the shipping volume and a delivery schedule.

  • Factory-made modules, shipped worldwide
  • Catalog models or your own drawings
  • Camps, clinics, schools and dormitories